pvc drop ceiling tiles
-
Next, determine the location of the main runners. You will need to install hanger wires to support the main runners. Hanger wires should be spaced no more than 4 feet apart, and they should be attached to the ceiling joists. Use a power drill to make holes in the joists and insert the wires securely, ensuring they are taut and hanging down to the level of the desired grid height.
...
-
...